Bay Area Transit News

Your Source for the Bay Area's Latest Transportation News

News

The First Bus Rapid Transit Line is Coming to the East Bay!

Posted on April 5, 2016 at 11:40 AM

The AC Transit Board of Directors has given O.C. Jones & Sons the official $108 million construction contract to build & construct the East Bay's first bus rapid transit (BRT) line!


AC Transit's future sophisticated BRT lines will travel between 20th Street & Broadway, in Downtown Oakland, to San Leandro BART along International Boulevard. 


The BRT system will replace AC Transit's existing Routes 1 and 1R, starting at 20h Street & Broadway. Unique transit signal technology will allow buses to partially control traffic lights, allowing a bus to pass through before turning red.


New, ultra-low emission 60-foot articulated buses manufactured locally by New Flyer will run on the BRT line. Each bus will have five doors to speed up the boarding and exiting process.


AC Transit's BRT system will be frequent as well - every 5 minutes during rush hours and every 10 minutes during off-peak times. Raised platform stops will be placed approximately every 1/3 of a mile.


The system will span 9.5 miles, with a majority of the line on International Boulevard and East 14th Street, in Oakland and San Leandro.


AC Transit's new BRT buses will also come with some innovative features - Interior bike racks will be included and new wheelchair tie-down systems will reduce dwell time while securing a person in a wheelchair.


The BRT line will make direct connections with 46 of AC Transit's bus lines, five BART stations, and Oakland International via a transfer to Route 73. 


To learn more about AC Transit's innovative BRT system, visit http://brt.actransit.org/. For more info, visit actransit.org.

Categories: AC Transit, East Bay, BRT

Post a Comment

Oops!

Oops, you forgot something.

Oops!

The words you entered did not match the given text. Please try again.

Already a member? Sign In

0 Comments